Calendar Thursday, March 11, 2010
Chip Rudin, Director

Search

Upcoming Events

Fri, Mar 12th, @12:00am - 12:00PM
ORPAC Hispanic Pastor/Family Retreat
Fri, Mar 19th, @12:00am - 12:00PM
Harrisburg Christian Youth Retreat
Fri, Apr 9th, @12:00am - 12:00PM
Eugene 1st Naz Ladies Retreat

Weather

Oakland, OR
Temp: 43°F
Feels Like: 43°F
Humidity: 80%
Speed: N/A
Direct.:
Pressure: 30.05 in
CALM
Show more details
Provided by:

Donate Now

Camp Improvements


Camp Operations

Major
New Well and Water Tank Print E-mail
photo70
New Well & Water Tank: $200,000—$250,00.  We are currently working on estimates for the project.  Our current system will not be adequate when it is time to add a new lodge.
 
Two New Cabins Print E-mail

photo71Two New Cabins: $35,000 ea

$12,000 was just donated toward a new cabin by the Roseburg Church on the Rise 11/26/2009.  [See Blog: Merry Christmas.]

The two cabins will be identical to this one.  A cabin consist of two rooms each room with it’s own bath & 5 bunks.  One cabin will accommodate 20 people. To view what the inside will look like:  click here.

 
New Nurses Station Print E-mail
New Nurses Station: $50.000
Construction began on the Nurse's Station in September 2009. The foundation is in & the walls are up.  Truses & roof will be ordered in January. The funds were donated for this project & we give God all the praise!
 
New Lodge Print E-mail

New Lodge: $450—$500,000
The purpose of a lodge is to add a very nice facility for adult retreats.  
It will include a large meeting room, kitchen, & fireplace.  Rooms will
be accessible from inside the facility.
Currently all of our rooms have bunks or twin beds. 
The new lodge will allow us to accomodate two groups at one time.

 
Gym Flooring Print E-mail
Gym Flooring: $30,000—$40,000
Our current gym floor is concrete.  It is cold in the winter & dangerous when someone falls.  We are looking into the new snap together flooring.
 
Brush Eater Print E-mail

Rock Hound Brush eater:
$10,000 Our road to the camp is one mile long with steep banks going up & down.  We have blackberry bushes & scotch broom on both sides leading up to the camp.  Currently it costs $1,100 to have the banks mowed along the entrance road one time & that does not include the side roads.  The above price is for a Rock Hound that fits our backhoe.  You can see it in operation at rockhound.com.   What a blessing this equipment would be to the beautifying of our camp.